Consulting MEP Engineering
Owner Representation
Commissioning Inspection & Testing


Presti & Company, Inc.
Dulles, Virginia

p. 703.430.4757

 

 
 
 

EIT Industrial Manufacturing Facility

EIT Industrial Manufacturing Facility - 27,000 sf hi tech electronic manufacturing facility with specialty clean production, humidity controlled, electric card and chip manufacturing, office, and warehouse space.

Semler Dermatology

Semler Dermatology - MEP Design and Project Management including preparation and review of bid packages, contractor selection, coordination of trades, on-site inspection, Quality Assurance, and coordination of telecommunications and utilities.

Services:

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Fire Alarm
  • Fuel Gas


Stafford Commerce Park II

Stafford Commerce Park II - New office development for 60,000 sf base building, a three story 20,000 floor plate structure.

Winchester Parks & Recreation Pool Dehumidification

Winchester Parks & Recreation Pool Dehumdification
- Complete replacement of central dehumidifcation system including dehumidifier and replacement of hydronic heating system. Sustainable design features include heat rejection to the pool water to maintain temperature and condensate capture and return to pool for reduction in make-up water requirments.

Sustainable Engineering

Celebrating 16 Years of High Performance Building Design Excellence.
 
 
Copyright © 2013 Presti & Company, Inc. All Rights Reserved.